In September 2022, Sydney Desalination Plant Pty Ltd (SDP) provided its pricing proposal and supporting materials to IPART. The following section outlines the different materials provided by SDP.
Main pricing proposal documents
- SDP 2023-27 – Pricing submission – Plain English summary
- SDP 2023-27 – Pricing submission
- SDP 2023-27 - Appendix
Supporting materials
- 1-1 – CEO Declaration
- 1-2 – Chair Declaration
- 4-1 – Level of service under new operating rules (Ontoit)
- 4-2 – RP3 Submission engagement report (RPS)
- 4-3 – Customer research (StollzNow)
- 6-1 – IPART correspondence on approach to averaging period for rate of return
- 7-3 – Surplus electricity sales analysis (Seed Advisory)
- 9-8 – Efficiency of long term contracts (Frontier Economics)
- 9-9 – Analysis of GGRP Contracts (ACIL Allen)
- 10-1 – SDP Report - Prudency of membrane replacement in 2019
- 10-2 – SDP Capital Works Procedure
- 10-4 – SDP 5-year Capex Plan
- 10-5 – SDP Procurement Policy
- 10-7 – Project Summary - Ongoing RO membrane replacement
- 10-8 – Project Summary - Dual 132kV Feeder
- 10-9 –Project Summary - Drinking Water Pumping Station - Additional Pump
- 10-10 – Project Summary - Drinking Water Pumping Station - Electrical Cooling
- 10-11 – Project Summary - RO Sampling Panels
- 10-12 – Project Summary - Switchroom Fire Suppression
- 10-13 – Project Summary - Lime System Efficiency Improvements
- 10-14 – Project Summary - Protection of Intermediate Permeate Tanks
- 10-15 – Project Summary - Second Drinking Water Tank
- 11-2 – Allowed rate of return for SDP (Frontier Economics)
- 11-4 – Technical memorandum on SDP's pipeline design life (KBR)
- 11-5 – Economic asset lives and regulatory precedents (Frontier Economics)